MB HOLDING G. EAST ENERGY FORUM BULLETIN

MB HOLDING G. EAST ENERGY FORUM BULLETIN

“DORA IS OPERATING ON JUNE 3”

MB HOLDING ENERGY GROUP CHAIRMAN ADNAN ŞAHİN TAKES PLACE AS SPEAKER AT THE SOUTHEASTERN ENERGY FORUM PREPARED BY THE TURKISH CHAMBERS OF ENGINEERS AND ARCHITECTS.

The Southeast Energy Forum, which was held for the third time this year, was held at the Grand Hotel with a large number of participants. The forum, in which the problems identified in the field of energy in our country and region, solution suggestions and especially renewable energy resources of close interest to the region were evaluated, was quite active.

In the forum, “Local / Alternative Energy Resources, usage and energy efficiency”, Gaziantep University Mechanical Engineering Department Head Prof. Dr. Sait Söylemez, Head of Energy Group of MB Holding A.Ş Adnan Şahin, Dr. from AKUA Energy-Engineering. Mehmet Hengirmen, Solarturk Vice Chairman Osman Özberk and GAP Regional Development Administration Dr. Muhyettin Sirer made their speeches.

ŞAHİN; “THE GPP FACILITIES THAT WILL BE IN OUR WORK IN 2015 WILL HAVE APPROXIMATELY 400 MW INSTALLED POWER”

The first geothermal power plant in Turkey (GPP) establishing MB Holding Energy Group Chairman Adnan Sahin speech of the holding company’s current and future investments JES system was passed on the stage.

Hawk; “The usage area of ​​geothermal energy is quite wide. Today, geothermal energy can be used in electricity generation, district heating, greenhouse cultivation, food drying, spas, cooking or aquaculture. As it is known, geothermal energy is a local, clean, renewable and sustainable energy source. It can be used integrated for electricity and heat energy generation. Geothermal energy, which has low operating costs despite its high investment costs, can generate electricity 24/7 without interruption.

Speaking of MB Holding’s investments, Şahin said; “As Menderes Geothermal, our Dora-1 and Dora-2 power plants are currently actively generating energy. Dora-3 will be active in June. Our next project is to bring Dora-4 and Dora-5 to life. GPP facilities under MB Holding will have approximately 400 MW of installed power in 2015 & nbsp; He spoke in the form of.

TARGET IN SULTAN SERA is 160 THOUSAND M2

Adnan stressed that use of geothermal energy in agriculture Hawk “Sultan we have established greenhouse Holding, one of Turkey’s most modern greenhouse. We are here for our tomatoes we produce 40 thousand square meter area of ​​geothermal energy, we are giving the rest of the half exports to the Netherlands to Turkey market. Our goal in Sultan Sera is to increase our facilities to 160 thousand square meters ”.

Şahin concluded his speech by saying that they use every drop of water in Geothermal Energy and they clean the carbon gases from both power plants in production and turn them into normal carbon dioxide and sell them.

Southeast Energy Forum ended with a plaque ceremony given to panelists.